您好,欢迎光临莱州聚峰机械有限公司网站! 主营自动搅拌车,搅拌一体车,自动上料搅拌车等各种规格的产品。

自动上料搅拌车生产厂家

点击拨打服务热线:4008791999

您的位置:首页 - 新闻中心 > 常见问题

自动上料搅拌车拆卸前要做什么准备?

发布时间:2022-03-28 来源:http://www.jfhntjbc.com/ 浏览量:0

概述: 我们都清楚自动上料搅拌车安装成功后尽量不要进行拆卸,万一拆卸不当会影响设备使用,但总是会有这样那样的原因,让我们不得不对去其进行
 我们都清楚自动上料搅拌车安装成功后尽量不要进行拆卸,万一拆卸不当会影响设备使用,但总是会有这样那样的原因,让我们不得不对去其进行拆卸维修,那么拆卸前要做什么准备?
  We all know that the automatic feeding mixer should not be disassembled as far as possible after the installation is successful. In case improper disassembly will affect the use of the equipment, but there will always be such and such reasons that we have to disassemble and repair it. Then what should we prepare before disassembly?
  拆卸前检查:在拆卸自动上料搅拌车前,技术人员会对设备的使用情况和各系统的运行情况进行检查,做好记录,并采取切实可行的预防措施,隐患和避免拆卸过程中的意外损坏,造成不必要的经济损失。
  Check before disassembly: before disassembly of automatic feeding agitator, technical personnel will carry out a comprehensive check on the use of equipment and the operation of each system, make a good record, and take feasible preventive measures to eliminate potential safety hazards and avoid accidental damage in the process of disassembly, resulting in unnecessary economic losses.
  拆前保养:为保证下次安装时设备的正常运行,必须对设备进行拆前的整体清洗和上油保养,保证每台机器的润滑到位,以便为搬迁做准备。
  Pre-disassembly maintenance: in order to ensure the normal operation of the equipment during the next installation, the overall cleaning and oiling maintenance of the equipment must be carried out before disassembly to ensure the lubrication of each machine in place, so as to prepare for relocation.
  一般需要检查的主要部位:主机粉料称重机卸料门、运行时轴端润滑、主机卸料门、水泥仓、粉煤灰仓及螺杆机有旧料,粉仓的卸料各秤的卸料口和卸料阀,配料机的卸料口,自动上料搅拌车的外观等部位。
  General need to check the main parts: host powder weighing machine unloading door, running shaft end lubrication, host unloading door, cement bin, fly ash bin and screw machine with old material, powder silo unloading of each scale unloading port and unloading valve, batching machine unloading port, automatic feeding mixing car appearance and other parts.
  作业现场:现场路基为混凝土,自动上料搅拌车周边的膨润土、细砂、蓄水池等材料及设施,在拆机前一周内全部清理完毕后运出。确保施工现场无障碍物,并有足够的空间进行拆除工作。
  Work site: the roadbed is concrete, bentonite, fine sand, reservoir and other materials and facilities around the automatic feeding mixer are all cleaned up and shipped out within a week before disassembly. Ensure that the construction site is free of obstructions and has sufficient space for demolition work.
  有的自动上料搅拌车工作效率越来越低,那么出现这一状况的原因可能是因为没有及时保养维修,再者或许是因为没有正确的保养,具体它还是有挺多的保养禁忌,比如忌机油只加不换;忌缸套和活塞新品不经选配即安装;忌不检查柱塞行程余量。所以要求大家要对该设备保养以及会保养,正确的方法非常重要,想了解的话就来http://www.jfhntjbc.com咨询吧!
  Some automatic feeding mixer work efficiency is lower and lower, so the reason for this situation may be because there is no timely maintenance, and perhaps because there is no correct maintenance, specific it still has a lot of maintenance taboo, such as avoid oil only add not change; Avoid cylinder liner and piston new without matching that installation; Do not check the piston travel allowance. Therefore, we are required to maintain the equipment and will maintain, the correct method is very important, if you want to know about it, come to http://www.jfhntjbc.com consultation!

截屏,微信识别二维码